Product Selector

Filters
Applications
Product Type
Certifications
Thermal Conductivity
Product Certifications Applications Viscosity Cure Schedule Hardness Temp. Range Link to Content
One component, silver conductive epoxy adhesive featuring high bond strength
Supreme 3HTS-80
One component, toughened, silver conductive epoxy system
Tensile Lap Shear Strength
400-500 psi
Volume Resistivity
<0.05 ohm-cm
  • RoHS Compliant
  • Bonding
  • Sealing
  • Coating
  • Gap Filling
paste Cures at 175°F to 185°F for 2 to 3 hours 50-60 Shore D -100°F to +350°F /fr/tds/supreme-3hts-80
Supreme 42HT-2 Two Part Epoxy
Supreme 42HT-2
Two component epoxy system for bonding, sealing, coating and encapsulation
Dielectric Strength
440 volts/mil
Glass Transition Temperature (Tg)
130-135°C
  • RoHS Compliant
  • Bonding
  • Sealing
  • Coating
  • Encapsulation
  • Gap Filling
  • Potting
  • Casting
Part A: 75,000-125,000 cps, Part B: 30-70 cps 48-72 hours at 75°F; 2-3 hours at 200°F; overnight at 75°F followed by 3-5 hours at 160-200°F 70-80 Shore D -80°F to +450°F /fr/tds/supreme-42ht-2
Supreme 42HT-2ND Two Part Epoxy
Supreme 42HT-2ND
Two component epoxy system for bonding, sealing and coating
Glass Transition Temperature (Tg)
130-135°C
Volume Resistivity
>10¹⁴ ohm-cm
  • NASA Low Outgassing
  • RoHS Compliant
  • 1,000 Hours at 85°C/85% RH
  • Bonding
  • Sealing
  • Coating
  • Gap Filling
paste overnight at 75°F followed by 3-5 hours at 160-200°F 75-85 Shore D -80°F to +450°F /fr/tds/supreme-42ht-2nd
Supreme 42HT-2ND Black Two Part Epoxy
Supreme 42HT-2ND Black
Two component, non-flow epoxy system for bonding, sealing and coating
Dielectric Constant
4.5
Glass Transition Temperature (Tg)
130-135 °C
  • NASA Low Outgassing
  • RoHS Compliant
  • 1,000 Hours at 85°C/85% RH
  • Bonding
  • Sealing
  • Coating
  • Gap Filling
paste 48-72 hours at ambient temperatures and in 2-3 hours at 200°F; optimum cure schedule is overnight at 75°F followed by 3-5 hours at 160-200°F 75-85 Shore D 4K to +450°F /fr/tds/supreme-42ht-2nd-black
Supreme 42HT-2ND-2 Two Component Epoxy
Supreme 42HT-2ND-2
Two component epoxy system for bonding, sealing and coating
Glass Transition Temperature (Tg)
130-135°C
Volume Resistivity
>10¹⁴ ohm-cm
  • RoHS Compliant
  • Bonding
  • Sealing
  • Coating
  • Gap Filling
paste 48-72 hours at ambient temperatures and in 2-3 hours at 200°F 70-80 Shore D -80°F to +450°F /fr/tds/supreme-42ht-2nd-2
Supreme 45HT Two Component Epoxy System
Supreme 45HT
Toughened, two component epoxy system for bonding, sealing and coating
Dielectric Constant
4.5
Tensile Lap Shear Strength
>2,500 psi
  • RoHS Compliant
  • Bonding
  • Sealing
  • Coating
  • Encapsulation
  • Potting
35,000-60,000 cps 250-300°F for 3-4 hours followed by a post cure at 350-400°F for 1-2 hours 80-90 Shore D -100°F to +450°F /fr/tds/supreme-45ht
Supreme 45HTND-2LO Black Two Part Epoxy
Supreme 45HTND-2LO Black
Toughened, two component epoxy system featuring high temperature resistance
Dielectric Constant
4.5
Tensile Lap Shear Strength
2,200-2,400 psi
  • RoHS Compliant
  • NASA Low Outgassing
  • 1,000 Hours at 85°C/85% RH
  • Bonding
  • Sealing
  • Coating
  • Gap Filling
paste 250-300°F for 3-4 hours followed by a post cure at 350-400°F for 1-2 hours 80-90 Shore D -100°F to +450°F /fr/tds/supreme-45htnd-2lo-black
Supreme 45HTQ Two Part Epoxy Compound
Supreme 45HTQ
Two component epoxy system for bonding, sealing and casting
Tensile Lap Shear Strength
2,100-2,300 psi
Tensile Modulus
500,000-550,000 psi
  • RoHS Compliant
  • 1,000 Hours at 85°C/85% RH
  • Bonding
  • Sealing
  • Casting
  • Coating
  • Encapsulation
  • Potting
20,000-30,000 cps 4 to 6 hours at 250°F, 4 to 5 hours at 350°F, optimal cure schedule is 300°F for 2 hours, followed by post curing at 350°F for 4 to 6 hours. 80-90 Shore D -60°F to +450°F /fr/tds/supreme-45htq
Supreme 45HTQ Two Component Epoxy
Supreme 45HTQ-4
Two component epoxy system for bonding, sealing and casting
Coefficient of Thermal Expansion
30-35 x 10⁻⁶ in/in/°C
Dielectric Constant
4.5
  • RoHS Compliant
  • Bonding
  • Sealing
  • Coating
  • Gap Filling
paste At 250°F, the cure time is 4-6 hours but at 300°F, this system will cure in 4-5 hours. 85-90 Shore D -100°F to +450°F /fr/tds/supreme-45htq-4
Two Part Epoxy System Supreme46HT-1AO
Supreme 46HT-1AO
Two part, thermally conductive, electrically insulative epoxy for bonding and sealing featuring outstanding heat resistance; requires oven curing
Dielectric Strength
450 volts/mil
Tensile Modulus
600,000-650,000 psi
  • RoHS Compliant
  • 1,000 Hours at 85°C/85% RH
  • NASA Low Outgassing
  • Bonding
  • Sealing
  • Coating
  • Encapsulation
  • Gap Filling
75,000-150,000 cps 2 hours at 300°F, followed by 3-4 hours at 350-400°F. 85-95 Shore D -100°F to +550°F /fr/tds/supreme-46ht-1ao

Need Expert Guidance?

Our expert engineers offer one-on-one consultations to help you navigate our extensive material library and find the right solution for your application. We ensure confidentiality and quick turnaround (1-2 business days).